October 15, 2023

Shoot 360 Tbilisi

Date: 2019

Client: ” Zaza Pachulia Academy”

As part of the collaboration with the Zaza Pachulia Academy, Baumer’s team designed and installed the ventilation systems.

Project area: 1500 sq.m

Other Projects